A kitchen renovation has a natural rhythm: decisions first, then a burst of noisy work, then a pause while worktops are made, then the finishing. Knowing the sequence helps you plan how long you will be without a kitchen.
Next step
Tell us your scope and when you want the work done. We match you with kitchen contractors who plan the sequence.
Request a kitchen renovation quoteOr message us on WhatsAppThe layout, cabinets, worktop material and appliance models are finalised and ordered before the old kitchen comes out. Cabinets made to order and imported appliances can take weeks, and starting demolition before they arrive leaves you without a kitchen for longer than necessary.
Once materials are confirmed, the old kitchen is removed, and plumbing, electrical and any gas or extraction changes are made at first fix. Walls and floors are repaired and, if planned, retiled. Base and wall cabinets are then installed and levelled, and the worktop templater visits.
While stone worktops are fabricated, the kitchen is partly usable at best. After the worktops are fitted, the sink, tap, hob and appliances are connected, the backsplash is tiled and lighting is completed. Final checks cover every appliance, every drawer and door alignment, and that the extractor and dishwasher drain correctly.
02QUESTIONS
03RELATED
Modern, functional kitchens designed for Dubai living.
How long each type of home renovation takes in Dubai.
Dust, noise, a temporary kitchen and safe zones for children — how to stay at home through a renovation in Dubai and keep daily life working.
Integrated or freestanding, induction or gas, and the power each needs.
Galley, L-shaped, U-shaped, peninsula or island — which kitchen layout suits your room and the way you cook, explained for Dubai homes.
04NEXT
Describe the work and the property, and get matched with contractors who quote it itemised before anything starts. There is no fee to use the platform.