01RETAIL FIT-OUT
Mall fit-outs run on the mall's rules. Tenant design criteria, design reviews, contractor registration and night-time working shape the design and the programme.
Next step
Tell us the mall, unit size and opening date. We match you with contractors who know mall processes.
Request a commercial consultationOr message us on WhatsAppEach mall publishes requirements for the shopfront, signage, lighting, materials and the bulkhead above the entrance. The design is submitted for review, usually more than once, before approval. Designing to the criteria from the start avoids rounds of revisions.
Noisy and dusty work often happens at night or outside trading hours, the unit is hoarded during works, and deliveries use loading bays at set times. Contractors may need to be registered with the mall and hold specific insurance. These factors add cost and time and should be in the plan.
Before opening, the mall inspects the fit-out and fire systems are tested and certified. Snags raised by the mall's team are closed before trading starts.
02QUESTIONS
03RELATED
Fit out a shop, kiosk or showroom in a Dubai mall or on the street.
Glazing, entrance doors, signage zones and display windows — designing and installing a shopfront that works in a Dubai mall or street.
Landlord consent, authority fit-out permits and fire and life-safety approvals — the sequence of approvals for a commercial fit-out in Dubai.